September 2006 - concrete slab


After keeping the slab covered with plastic and soaked with water for 3 days to cure, we uncovered it and there were no cracks!

I was (and still am) very happy with how the slab turned out.


2 comments:

  1. Did you hand mix the concrete or have it hauled in?

    ReplyDelete
  2. Jim, thanks for stopping by...it was hauled in from Alpine. If you are bored you can scroll to the bottom of the page, click 'older post' and see a post I did on pouring the slab.